Subscribe to this blog


Things we like

Search

Search form

Concrete Install / Master Bath

August 28, 2011. By lowdesign. 1 comment(s).

Installing the beast: the 500+ lb master bathroom countertop with integral sink.  Our plan involved building a platform on top of a dolly, and then getting some strong men together to maneuver the sink on and off the dolly into place.

Once inside the master bedroom, we raised the countertop on 2x4s so that it could be slid onto the supporting studs nailed to the master bathroom walls.  Then we could knock away the supporting pieces and let the sink hang.

All went surprisingly smoothly.  No cracks so far!

Add comment

Good weblog. I absolutely love browsing it all.